9.14.17 – Project Update

Kevin Hargrave has been on site since late Tuesday evening. He has been making some small changes to the initial design of 11 but ultimately has approved some of the bunkers. TDI will be able to begin draining the new bunkers this week and the liner and sand will follow shortly after.

Speaking of sand, have you seen how much is in the parking lot?!? TDI will continue to stage material near the pool parking lot, thank you for avoiding use of the back gate. We have seen very few issues with traffic control around the club grounds.

Below you will see some pictures of the rough shape of the new features on 11 and 12.

Pictured above, 2 new fairway bunkers on the right of 11 fairway.

Below, Javier and Jose are installing the new drain exit on the single left fairway bunker @11


Kevin looks over the new left greenside bunker at 11 as Jairo puts the topsoil on.

I will update with more pictures later.

Thank you for your support.

– J.R. Lynn, GCS

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s